Asphalt Restoration

Restore existing asphalt substrates including BUR and Modified Bitumen

asphalt 1

BUR (BUILT-UP ROOF)
1. Surface Prep

  • Wash with TSP substitute and water; rinse or power wash
  • Remove loose granules
  • Roof system must be clean and dry with surface temperature below 115°F at time of application
  • All underlying materials must be fully cured

2. Repair & Seal

  • Fill small ponding areas with Quicket
  • Coat flashing seams with 103 Crack & Joint Sealant and Polytek Fabric as needed
  • Repair ply sheets, leaks, seams, and drains as needed
  • Optional: Coat with quality asphalt emulsion to seal and strengthen

3. Prime

  • No priming required

4. Finish Coat

  • Apply two coats of appropriate E-Las-Tek® finish coat
  • Apply with 1/2″ or 1-1/4″ nap roller or airless spray
  • Minimum two coats (20 Mils DFT total) for service life warranty

Modified Bitumen
1. Surface Prep

  • Ensure that new modified bitumen roofs have fully cured before attempting to coat. Curing may take 30-180 days, depending on type and manufacturer
  • Wash with TSP substitute and water; rinse or power wash
  • Remove loose granules
  • Roof system must be clean and dry with surface temperature below 115°F at time of application
  • All underlying materials must be fully cured

2. Repair & Seal

  • Fill small ponding areas with Quicket
  • Coat flashing seams with 103 Crack & Joint Sealant and Polytek Fabric as needed
  • Repair ply sheets, leaks, seams, and drains as needed
  • Optional: Coat with quality asphalt emulsion to seal and strengthen

3. Prime

  • No priming required

4. Finish Coat

  • Apply 2-3 coats of appropriate E-Las-Tek® finish coat
  • Apply with 1/2″ or 1-1/4″ nap roller or airless spray
  • Minimum two coats (20 Mils DFT total) for service life warranty

Before & After Photos

asphalt 2

asphalt 3

asphalt 4

asphalt 5

asphalt 6

Benefits

  • Reduce energy costs
  • Slow the aging process
  • Decrease future maintenance cost
  • Change the life cycle of the roof